Go Back

High Tech High North county

Involving 112,728 SF over three buildings, our project with High Tech High included floor-to-ceiling Fleetwood glass doors, interior stained and polished concrete floors, exterior concrete flatwork, a fenced-in garden area, and large sail shades. This project has been certified LEED Silver.

High Tech High North county

Project Details

The High Tech High North County campus is one of the many High Tech High campuses Bycor has built. High Tech High North County Campus is a 112,728 SF, three-building campus set on nine acres of land. The facility has many features which include floor to ceiling Fleetwood glass doors, interior stained and polished concrete floors, exterior concrete flatwork, a fenced-in garden area and large sail shades. This school is going green and is LEED Silver.

  • Location: San Marcos
  • Square Feet: 112,728
  • Architect: Studio E